logo

Integrated Sewage Lifting Station Water Supply System for Factory

1set
MOQ
USD3940/sets 1-4 sets
Price
Integrated Sewage Lifting Station Water Supply System for Factory
Features Gallery Product Description Request A Quote
Features
Specifications
Features: Automatic Operation, Anti-clogging Design, High Efficiency
Theory: Booster Pumps
Warranty: 1 Year
Head: Up To 100 M
Voltage: 220V/380V/440V/460V/480V
Application: Sewage And Wastewater Treatment
Highlight:

Integrated Sewage Lifting Station

,

Sewage Lifting Water Supply System

,

Factory Sewage Lifting Station

Basic Infomation
Place of Origin: China
Brand Name: readycome
Payment & Shipping Terms
Payment Terms: D/A,D/P,T/T
Product Description

Factory Integrated Sewage Lifting Station and Control Solutions Water Supply System

 
Our Features 
 
1. Sewage Well (Wet Well): A sewer well is a container for storing sewage, usually at a lower location. It can be a buried or above ground structure with sufficient volume to store wastewater.
 
2. Lift Pump: A lift pump is a piece of equipment used to pump sewage from a sewer well and lift it to a higher location or treatment facility. It usually consists of one or more pumps that can be controlled to operate the pump as needed.
 
3. Control System: Sewage lifting devices are usually equipped with a control system to monitor the sewage level and regulate the operation of the lift pump. The control system can automatically start and stop the lift pump to ensure the safe discharge and proper operation of the sewage.
 
4. Valves and piping: A network of valves and piping used to control and direct the flow of sewage. They connect sewer wells, lift pumps and other wastewater treatment facilities or piping systems.
 
5. Automatic control: Sewage lifting devices are usually equipped with an automatic control system that can automatically start and stop the lifting pump according to changes in the sewage level to ensure stable operation of the system. This reduces the need for human operation and monitoring and improves operational efficiency.
 
6. Safe and reliable: The design of both the lifting pump and the control system take into account the special characteristics of the sewage environment, with strong corrosion resistance and anti-clogging ability. They can handle wastewater safely and reliably, avoid clogging or damage to the pumps, and ensure that the discharged wastewater meets treatment and environmental requirements.
 

Integrated Sewage Lifting Station Water Supply System for Factory 0

Integrated Sewage Lifting Station Water Supply System for Factory 1

Integrated Sewage Lifting Station Water Supply System for Factory 2

Integrated Sewage Lifting Station Water Supply System for Factory 3

Integrated Sewage Lifting Station Water Supply System for Factory 4

Integrated Sewage Lifting Station Water Supply System for Factory 5

Integrated Sewage Lifting Station Water Supply System for Factory 6

Application
Integrated Sewage Lifting Station Water Supply System for Factory 7 Integrated Sewage Lifting Station Water Supply System for Factory 8
Integrated Sewage Lifting Station Water Supply System for Factory 9 Integrated Sewage Lifting Station Water Supply System for Factory 10
 
 
Details Images
Integrated Sewage Lifting Station Water Supply System for Factory 11 Integrated Sewage Lifting Station Water Supply System for Factory 12
Thickened stainless steel
is of good rust and corrosion resistance. The quality can withstand testing.
Swivel check valve
will not be stuck with ball or impurities, with built-in cleaning function.
Integrated Sewage Lifting Station Water Supply System for Factory 13
Integrated Sewage Lifting Station Water Supply System for Factory 14
Stainless steel handheld
is easy to use and more secure without hurting hands
Pipeline interface
is firm and not loose easily.
Integrated Sewage Lifting Station Water Supply System for Factory 15
Integrated Sewage Lifting Station Water Supply System for Factory 16
Stainless steel unit
pipeline is made of qualified standard accessories and precision measurement process
Manual valve
Use the Manual valve when to control thus no gap and foreign objects are not easy to flow out.
 
 
 
 
 
 
 
 
 
 
 
 
Projects
Integrated Sewage Lifting Station Water Supply System for Factory 17
Integrated Sewage Lifting Station Water Supply System for Factory 18
Integrated Sewage Lifting Station Water Supply System for Factory 19
Integrated Sewage Lifting Station Water Supply System for Factory 20
Integrated Sewage Lifting Station Water Supply System for Factory 21
Integrated Sewage Lifting Station Water Supply System for Factory 22
 
Integrated Sewage Lifting Station Water Supply System for Factory 23
Integrated Sewage Lifting Station Water Supply System for Factory 24
 
 
Recommended Products
Get in touch with us
Contact Person : Victoria Li
Tel : 18908070651
Characters Remaining(20/3000)